Wuhan Goldsol Co. Ltd.
iso9001 certificate of goldsol
Products Category
Contact Us

Name: Mr.Luo
Tel: 86-27-82423362
Fax: 86-27-82949301
E-mail: goldsol@foxmail.com
Add: No.128 Sanyang Road Wuhan CN
QQ: 1121620921 (WeChat: lzping8)
QQ: 1121620921 (WeChat: lzping8)

FAQ

Frequently Asked Questions on VLF Hipot Testing and Equipment Selection

Selection and Principle

1. What is the difference between VLF and power frequency withstand testing?

Power frequency (50/60 Hz) testing requires large capacity and heavy equipment, which suits laboratories and small test objects. VLF testing applies 0.1 Hz (or 0.02–0.1 Hz), which reduces the capacitive current of the test object in proportion to frequency. Equipment capacity and weight drop dramatically, making VLF practical for on-site testing of long cables and large generators. Equivalence of defect detection is recognised by IEC 60060-3 and DL/T standards.

2. How do I calculate the required VLF capacity?

Use I = 2πfCU to find the capacitive current at the test frequency, then multiply by test voltage. For example, at 0.1 Hz with 10 µF at 30 kV the current is about 1.88 mA — a very small capacity requirement. Requirements rise with capacitance, voltage and higher test frequencies. Allow margin for ramp rate and test duration. Send us cable length, cross-section and voltage class and we will calculate it for you.

3. Which voltage class do I need? Is 30 kV enough?

For 10 kV cables the acceptance test voltage is typically 2.5U₀ (about 17 kV peak); for 35 kV cables about 2.0U₀. With margin, 30 kV covers 10 kV and below. For 35 kV cables choose 50 kV or above; for 110 kV and long large-capacity runs, 80–100 kV with higher capacity is required.

4. What is the difference between VLF, VLF with Tan Delta and VLF with PD?

A basic VLF set performs withstand testing only. Tan Delta models measure dissipation factor during the test, revealing moisture and ageing. PD models measure discharge magnitude to locate localised defects. Combined Tan Delta plus PD models suit acceptance and diagnostic testing where condition assessment matters. For routine acceptance testing, the basic model is sufficient.

5. 0.1 Hz or 0.02 Hz?

0.1 Hz is the mainstream choice — shorter test time and higher efficiency. 0.02 Hz is used for very large capacitive loads such as long submarine cables and large generators, further reducing current demand. Most field work uses 0.1 Hz.

Testing and Operation

6. What preparation is needed before a cable withstand test?

Measure and record insulation resistance to confirm there is no short or ground fault. Verify phase identification at both ends. Disconnect or isolate arresters and instrument transformers that cannot withstand the test voltage. Set up barriers and warning signs with a dedicated attendant. Confirm a solid ground and keep the high voltage lead short and free-standing.

7. How long should the test voltage be applied?

Acceptance testing typically applies the specified voltage for 15–60 minutes depending on standard and cable type, while watching for current instability or abnormal discharge noise. If current keeps rising or breakdown occurs, reduce voltage and stop immediately for inspection.

8. What causes abnormally high leakage current?

Common causes: damp or contaminated cable terminations, long test leads adding stray capacitance, an insulation defect in the test object, poor grounding, or high ambient humidity. Clean and dry the terminations, shorten the leads, check grounding and retest.

9. What if Tan Delta readings are high?

First rule out interference: verify the connection and shielding, and confirm temperature and humidity are within range. If the reading stays high on repeat measurement, compare against historical data and similar cables, and use PD testing to localise. A single absolute value is less meaningful than the trend.

10. How do I suppress interference during PD testing?

Use shielded dedicated test leads, ground the equipment and test object at a single point, and switch off inverters and dimmer lighting in the area. Measure background noise first as a baseline. Non-intrusive (ultrasonic/UHF) instruments suit live inspection; contact-type measurement suits quantitative off-line testing.

Standards and Compliance

11. Which standards do the products follow?

Design and testing follow IEC 60060-3 (VLF testing), GB/T 3048 (electrical test methods for cables) and DL/T 596 (preventive testing regulations). Products hold CE-EMC, CE-LVD and ISO 9001 certification.

12. Are third-party test reports available?

Every unit ships with a factory test report. Third-party calibration or type test reports from an accredited laboratory can be arranged at the time of order.

13. What documents are provided for export?

Commercial invoice, packing list, certificate of origin, CE declaration of conformity, English manual and operation guide. Other documents can be arranged for destination-country requirements; timber packing can be ISPM 15 treated.

Maintenance and After-Sales

14. How should the equipment be maintained?

Keep it clean and dry, inspect grounding and high voltage leads for damage, power it up once a month during long storage, avoid high temperature, high humidity and vibration, and calibrate voltmeters and ammeters at the interval stated in the manual.

15. What is the warranty and spare parts policy?

Warranty terms are defined in the contract. Common spares — HV silicon stacks, capacitors, control boards, printer paper — are stocked long term so equipment is never idled by discontinued parts.

16. Is operator training available?

Yes. Manuals and operation videos are supplied in English. For batch orders and key projects we provide remote video training and, where needed, on-site commissioning support for the first test.

17. What if the equipment develops a fault?

Work through the fault codes in the manual first (power, grounding, over-current protection, discharge alarm). If unresolved, contact us with model, serial number and symptoms. We diagnose remotely and propose a fix, repair or on-site visit as appropriate.

Purchasing

18. What information do you need for a quotation?

Test object type and capacitance, required test voltage, applicable standard, site power supply, environmental conditions, quantity and delivery date. The more detail, the more accurate the proposal.

19. Do you offer customisation?

Yes. Typical custom work includes vehicle-mounted or containerised structures, high-altitude and low-temperature adaptation, special voltage/current combinations, added Tan Delta or PD modules, multi-language interfaces and integration with customer management platforms.

20. What is the lead time?

Common models are usually in stock or in production; confirmed lead time is given at order. Custom configurations are scheduled according to specification. Contact us early during peak season.